0 of 0 for ""

St Helens, Lancashire

Greengate Energy Recovery Facility

Sweco’s landscape team was appointed by ESBI to produce a landscape and visual impact assessment, phot and landscape masterplan in support of an application for a waste combustion plant within the operational Pilkington Glass manufacturing facility in St Helens.

Summary

Client
ESBI
Dates
2016 – 2018

Project story

This project seeks to create a facility which utilises waste refuse to create electricity within an existing industrial site.

Sweco’s landscape team was appointed by ESBI to produce a landscape and visual impact assessment, verified photomontages and landscape masterplan in support of an application for a waste combustion plant within the operational Pilkington Glass manufacturing facility in St Helens.

Sweco’s visualisation team produced verified photomontages of the proposed development, illustrating the proposed development in highly accurate and realistic detail.

Key services

  • Landscape and Visual Impact Assessment
  • Visualisation
  • Landscape Masterplanning
  • Outline Design

Send a general enquiry

Contact us today by filling in our quick form – one of our team will respond as soon as possible. Alternatively, call us on +44 (0) 113 262 0000
Copy link
Powered by Social Snap